Deluging rains can pour thousands of gallons of water onto a home’s roof in a single storm. In multi-level house designs where roofs intersect walls, much of this water is channeled along the wall to a gutter.

If sidewall flashing is lacking or inadequate, water runoff can get inside the wall and cause serious damage. In big storm events, rainwater can often overflow the gutter and stream down the walls. Diverters are sometime fashioned onsite in an attempt to direct this water into the gutters.

Install Roof Flashing Against Wall

If undersized, these diverters are not very helpful. If not properly integrated with the existing housewrap and cladding, they can do more harm than good by allowing water inside the wall cavities. The result can be significant damage to wall sheathing, framing, and insulation, and mold inside the wall cavities.

While older wood siding would show evidence of this water intrusion by peeling paint, new wall claddings like fiber cement, vinyl siding, and brick veneer can mask the evidence for years.Anywhere roof sections adjoin wall sections, step flashing should be used to keep water from entering the walls, and kick-out diverters should be used to direct the rainwater into rain gutters where it can be carried away from the structure. Proper flashing that is correctly integrated with housewrap and cladding along roof-wall intersections and kick-out diverters that are seamless and adequately sized to direct flowing water into the rain gutters are important tools to keep the wall cladding from being saturated by flowing water.

Kick-out diverters can be formed on site from sheet metal but these are often inadequately sized and have unsealed seams that fail over time. Large, seamless, plastic kick-out diverters are commercially available.These materials would be installed by roofers in coordination with housewrap and siding installers. This task should be included in the contract for the appropriate trade depending on the workflow at the specific job site.Wall flashing and kick-out diverters are required in the 2009 and 2012 IRC (R703.8) and 2015 IRC (R703.4).

See the Compliance tab. Figure 1 - Improper flashing can allow rain water into walls, causing significant damageHow to Install Sidewall Flashing and Kick-Out Diverters — On Homes with Rigid Foam Insulation Sheathing.Apply drip edge and roof underlayment over the roof deck and continue lapping up the sidewall and over the water-resistive barrier (in this case rigid foam insulation) a minimum of 7 inches (Figure 2).Install the shingle starter strip at the roof eave in accordance with the roofing manufacturer’s instructions (Figure 3).a. Place the seamless, one-piece, non-corrosive kick-out diverter as the first piece of step flashing.b. Slide the kick-out diverter up the roof plane until the starter trough stops at the shingle starter strip.

The diverter must be flat on the roof and flush to the sidewall (Figure 3).c. Fasten and seal the diverter to the roof deck and starter strip. (Do not fasten it to the sidewall.).Place the first row of shingles and next section of sidewall flashing over the up-slope edge of the diverter, lapping a minimum of 4 inches over the diverter (Figure 4). Sidewall flashing height requirement should be determined by a design professional and local building codes.).Install the remaining sidewall flashing, appropriate counter flashing, and shingles in accordance with the manufacturer’s instructions (Figure 5).Apply self-adhesive flashing over the top edge of the wall flashing, diverter, and rigid foam insulation (Figure 6).Apply construction tape over the self-adhered flashing (Figure 7).Apply siding over the rigid foam insulation. Apply construction tape over the self-adhered flashing.How to Install Sidewall Flashing and Kick-Out Diverters — On Homes with Housewrap over OSB or Plywood Sheathing.Apply drip edge and roof underlayment over the roof deck (Figure 8). Continue lapping up the sidewall and over the weather-resistive barrier (in this case housewrap) a minimum of 6 inches.Install the shingle starter strip at the roof eave in accordance with the roofing manufacturer’s instructions (Figure 9).a. Place the seamless one-piece non-corrosive kick-out diverter as the first piece of step flashing.b.

Slide the kick-out diverter up the roof plane until the starter trough stops at the shingle starter strip. The diverter must be flat on the roof and flush to the sidewall.c.

Fasten and seal the diverter to the roof deck and starter strip. (Do not fasten it to the sidewall.).Place the first shingle and next section of sidewall flashing over the up-slope edge of the diverter, lapping a minimum of 4 inches over the diverter as shown in Figure 10. (The sidewall flashing height requirement should be determined by a design professional and local building codes.).Install the remaining sidewall flashing, appropriate counter flashing, and shingles in accordance with manufacturer’s instructions (Figure 11).Apply self-adhesive flashing over the top edge of the wall flashing, diverter, and housewrap (Figure 12).Install the housewrap. Cut the housewrap to fit over the self-adhesive flashing and sidewall flashing (Figure 13).Apply siding over the housewrap. Water Management System Builder Requirements3. Water-Managed Roof Assembly.3.1 Step and kick-out flashing at all roof-wall intersections, extending ≥ 4” on wall surface above roof deck and integrated shingle-style with drainage plane above; boot / collar flashing at all roof penetrations.

12Footnote 12) Intersecting wall siding shall terminate 1 in. Above the roof or higher, per manufacturer's recommendations.

Continuous flashing shall be installed in place of step flashing for metal and rubber membrane roofs.Please see the for the program version and revision currently applicable in in your state.Exhibit 1 Mandatory Requirements.Exhibit 1, Item 1) Certified under the ENERGY STAR Qualified Homes Program or the ENERGY STAR Multifamily New Construction Program.AAMA 711-13. Voluntary Specification for Self Adhering Flashing Used for Installation of Exterior Wall Fenestration Products. Available from AAMA’s online store from the link above.

The specification establishes the test methods and minimum performance requirements for self adhering flashing products used around the perimeter of exterior fenestration products. It also provides a method to determine the minimum width of the flashing products and to evaluate the influence of the environmental factors on the installation of self adhering flashing products applied under typical field conditions.Section R703.8 Flashing. Approved corrosion-resistant flashing to be applied shingle-fashion to prevent water from entering into wall cavities or from penetrating into building structural framing components. Self-adhered flashing must comply with AAMA 711. Flashing at exterior window and door openings must extend to the surface of the exterior wall finish or to the water-resistive barrier. Corrosion-resistant flashings should be installed:.

Exterior and window door openings and extend to the exterior wall finish surface or water-resistive barrier. At intersection of chimneys or other masonry construction with frame or stucco walls, with projecting lips on both sides under stucco copings. Under and at ends of masonry, wood, or metal copings and sills. Continuously above all projecting wood trim.

Wall

Where exterior porches, decks, or stairs attach to a wall or floor assembly (wood-frame construction). At wall and roof intersections. At built-in gutters.Section R703.8 Flashing. Approved corrosion-resistant flashing to be applied shingle-fashion to prevent water from entering into wall cavities or from penetrating into building structural framing components.

Self-adhered flashing must comply with AAMA 711. Flashing at exterior window and door openings must extend to the surface of the exterior wall finish or to the water-resistive barrier. Flashing must be installed at the following locations:.

Exterior window and door openings. In accordance with fenestration manufacturer’s installation and flashing instructions or in accordance with the flashing manufacturer’s instructions.

Where instructions or details aren’t provided, pan flashing is to be installed at the sill of exterior window and door openings and must be sealed or sloped to direct water to the surface of the exterior wall finish or water-resistive barrier.

InspectAPedia tolerates no conflicts of interest., Lagrangeville, NY. Galow can be reached by email: or by telephone: 914-474-6613. Galow specializes in residential construction including both new homes and repairs, renovations, and additions. Mark Cramer, Tampa Florida, Mr. Cramer is a past president of ASHI, the American Society of Home Inspectors and is a Florida home inspector and home inspection educator. Contact Mark Cramer at: 727-595-4211 11/06.

is principal of Hankey and Brown home inspectors, Eden Prairie, MN. Hankey is a past chairman of the ASHI Standards Committee. Hankey has served in other ASHI professional and leadership roles. Contact Roger Hankey at: 952 829-0044 -. Hankey is a frequent contributor to., an ASHI member and a licensed home inspector in Kingston, NY, and has served on ASHI national committees as well as HVASHI Chapter President.

Puentes can be contacted at.Books & Articles on Building & Environmental Inspection, Testing, Diagnosis, & Repair. Our recommended books about building & mechanical systems design, inspection, problem diagnosis, and repair, and about indoor environment and IAQ testing, diagnosis, and cleanup are at the. Also see our.120 Carlton Street Suite 407, Toronto ON M5A 4K2. Tel: (416) 964-9415 1-800-268-7070 Email:.

The firm provides professional & &. Alan Carson is a past president of ASHI, the American Society of Home Inspectors.

Thanks to Alan Carson and Bob Dunlop, for permission for InspectAPedia to use text excerpts from The Home Reference Book & illustrations from The Illustrated Home.